Utilization of critical path method in the planning of İzmir Winery Wastewater Treatment Plant
buir.advisor | Erel, Erdal | |
dc.contributor.author | Bodur, İbrahim Volkan | |
dc.date.accessioned | 2016-01-08T20:08:46Z | |
dc.date.available | 2016-01-08T20:08:46Z | |
dc.date.issued | 1990 | |
dc.description | Cataloged from PDF version of article. | en_US |
dc.description | Includes bibliographical references leaves 35-36. | en_US |
dc.description.abstract | Critical Path Method (CPM) is an economic and useful tool to aid managers during preparation and application of projects for scheduling, giving control and coordination, and solving the problems. In this study, CPM is applied to İzmir Winery Wastewater Treatment Plant. A schedule is calculated by CPM and its network diagram and bar chart of ,works is prepared with the Primavera Project Planner which-is a project management and control software. | en_US |
dc.description.statementofresponsibility | Bodur, İbrahim Volkan | en_US |
dc.format.extent | vi, 80 leaves | en_US |
dc.identifier.uri | http://hdl.handle.net/11693/17273 | |
dc.language.iso | English | en_US |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.subject | critical path method | en_US |
dc.subject | planning and scheduling | en_US |
dc.subject | wastewater treatment plant | en_US |
dc.subject.lcc | TS158 .B63 1990 | en_US |
dc.subject.lcsh | Critical path analysis. | en_US |
dc.subject.lcsh | Sewage disposal plants. | en_US |
dc.title | Utilization of critical path method in the planning of İzmir Winery Wastewater Treatment Plant | en_US |
dc.type | Thesis | en_US |
thesis.degree.discipline | Business Administration | |
thesis.degree.grantor | Bilkent University | |
thesis.degree.level | Master's | |
thesis.degree.name | MBA (Master of Business Administration) |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- B006777.pdf
- Size:
- 3.91 MB
- Format:
- Adobe Portable Document Format
- Description:
- Full printable version