Utilization of critical path method in the planning of İzmir Winery Wastewater Treatment Plant

Date

1990

Editor(s)

Advisor

Erel, Erdal

Supervisor

Co-Advisor

Co-Supervisor

Instructor

BUIR Usage Stats
3
views
7
downloads

Series

Abstract

Critical Path Method (CPM) is an economic and useful tool to aid managers during preparation and application of projects for scheduling, giving control and coordination, and solving the problems. In this study, CPM is applied to İzmir Winery Wastewater Treatment Plant. A schedule is calculated by CPM and its network diagram and bar chart of ,works is prepared with the Primavera Project Planner which-is a project management and control software.

Source Title

Publisher

Course

Other identifiers

Book Title

Degree Discipline

Business Administration

Degree Level

Master's

Degree Name

MBA (Master of Business Administration)

Citation

Published Version (Please cite this version)

Language

English

Type