Utilization of critical path method in the planning of İzmir Winery Wastewater Treatment Plant
Date
1990
Authors
Editor(s)
Advisor
Erel, Erdal
Supervisor
Co-Advisor
Co-Supervisor
Instructor
BUIR Usage Stats
3
views
views
7
downloads
downloads
Series
Abstract
Critical Path Method (CPM) is an economic and useful tool to aid managers during preparation and application of projects for scheduling, giving control and coordination, and solving the problems. In this study, CPM is applied to İzmir Winery Wastewater Treatment Plant. A schedule is calculated by CPM and its network diagram and bar chart of ,works is prepared with the Primavera Project Planner which-is a project management and control software.
Source Title
Publisher
Course
Other identifiers
Book Title
Degree Discipline
Business Administration
Degree Level
Master's
Degree Name
MBA (Master of Business Administration)
Citation
Permalink
Published Version (Please cite this version)
Language
English