Common due date early

buir.advisorGürler, Ülkü
dc.contributor.authorŞirvan, Fatma
dc.date.accessioned2016-01-08T18:26:44Z
dc.date.available2016-01-08T18:26:44Z
dc.date.issued2013
dc.descriptionCataloged from PDF version of article.en_US
dc.descriptionIncludes bibliographical references leaves 91-96.en_US
dc.description.abstractThis study considers a scheduling problem with position-dependent deteriorating jobs and a maintenance activity in a single machine. Even in the absence of maintenance activity and deterioration problem is NP-hard. A solution comprises the following: (i) positions of jobs, (ii) the position of the maintenance activity, (iii) starting time of the first job in the schedule. After the maintenance activity, machine will revert to its initial condition and deterioration will start anew. The objective is to minimize the total weighted earliness and tardiness costs. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. Polynomial (O(n log n)) time solutions are provided for some special cases. No polynomial solution exists for instances with tight due-dates. We propose a mixed integer programming model and efficient algorithms for the cases where mathematical formulation is not efficient in terms of computational time requirements. Computational results show that the proposed algorithms perform well in terms of both solution quality and computation time.en_US
dc.description.statementofresponsibilityŞirvan, Fatmaen_US
dc.format.extentxviii, 110 leaves, graphsen_US
dc.identifier.urihttp://hdl.handle.net/11693/15921
dc.language.isoEnglishen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectSchedulingen_US
dc.subjectdeteriorating jobsen_US
dc.subjectdeteriorating maintenance activityen_US
dc.subjectcommon due dateen_US
dc.subjectearlinessen_US
dc.subjecttardiness.en_US
dc.subject.lccTS157.5 .S57 2013en_US
dc.subject.lcshScheduling--Data processing.en_US
dc.subject.lcshProduction scheduling--Data processing.en_US
dc.subject.lcshProduction scheduling--Mathematical models.en_US
dc.subject.lcshBusiness logistics.en_US
dc.subject.lcshJust-in-time theory.en_US
dc.titleCommon due date earlyen_US
dc.typeThesisen_US
thesis.degree.disciplineIndustrial Engineering
thesis.degree.grantorBilkent University
thesis.degree.levelMaster's
thesis.degree.nameMS (Master of Science)

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
0006617.pdf
Size:
2.72 MB
Format:
Adobe Portable Document Format