Common due date early

Date

2013

Editor(s)

Advisor

Gürler, Ülkü

Supervisor

Co-Advisor

Co-Supervisor

Instructor

Source Title

Print ISSN

Electronic ISSN

Publisher

Volume

Issue

Pages

Language

English

Type

Journal Title

Journal ISSN

Volume Title

Attention Stats
Usage Stats
3
views
14
downloads

Series

Abstract

This study considers a scheduling problem with position-dependent deteriorating jobs and a maintenance activity in a single machine. Even in the absence of maintenance activity and deterioration problem is NP-hard. A solution comprises the following: (i) positions of jobs, (ii) the position of the maintenance activity, (iii) starting time of the first job in the schedule. After the maintenance activity, machine will revert to its initial condition and deterioration will start anew. The objective is to minimize the total weighted earliness and tardiness costs. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. Polynomial (O(n log n)) time solutions are provided for some special cases. No polynomial solution exists for instances with tight due-dates. We propose a mixed integer programming model and efficient algorithms for the cases where mathematical formulation is not efficient in terms of computational time requirements. Computational results show that the proposed algorithms perform well in terms of both solution quality and computation time.

Course

Other identifiers

Book Title

Degree Discipline

Industrial Engineering

Degree Level

Master's

Degree Name

MS (Master of Science)

Citation

Published Version (Please cite this version)