Project management : a case study in construction industry
buir.supervisor | Muğan, Can Şımga | |
dc.contributor.author | Kömürcü, Ahmet Murat | |
dc.date.accessioned | 2016-01-08T20:10:30Z | |
dc.date.available | 2016-01-08T20:10:30Z | |
dc.date.copyright | 1993-06 | |
dc.date.issued | 1993-06 | |
dc.description | Cataloged from PDF version of article. | en_US |
dc.description | Includes bibliographical references (leaves 40-41). | en_US |
dc.description.abstract | Project management finds a wide application area in construction industry. In this thesis, a case study is carried out to determine the importance of project management, and to find how TimeLine Version 5.0 (a project management software) and S-curve can help the managers for a better application of project management. | |
dc.description.statementofresponsibility | Ahmet Murat Kömürcü | en_US |
dc.format.extent | vii, 74, 31 leaves ; 30 cm. | en_US |
dc.identifier.itemid | BILKUTUPB022924 | |
dc.identifier.uri | http://hdl.handle.net/11693/17464 | |
dc.language.iso | English | en_US |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.subject | Project management | |
dc.subject | Construction management | |
dc.subject | Critical path method | |
dc.subject | Planning and scheduling | |
dc.title | Project management : a case study in construction industry | |
dc.title.alternative | Proje yönetimi: inşaat sektöründe bir vaka çalışması | |
dc.type | Thesis | en_US |
thesis.degree.discipline | Business Administration | |
thesis.degree.grantor | Bilkent University | |
thesis.degree.level | Master's | |
thesis.degree.name | MBA (Master of Business Administration) |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- B022924.pdf
- Size:
- 4.37 MB
- Format:
- Adobe Portable Document Format
- Description:
- Full printable version