Integrated workforce capacity and inventory management under labour supply uncertainty

dc.citation.epage4304en_US
dc.citation.issueNumber15en_US
dc.citation.spage4281en_US
dc.citation.volumeNumber47en_US
dc.contributor.authorPac, M. F.en_US
dc.contributor.authorAlp, O.en_US
dc.contributor.authorTan, T.en_US
dc.date.accessioned2016-02-08T10:05:50Z
dc.date.available2016-02-08T10:05:50Z
dc.date.issued2009en_US
dc.departmentDepartment of Industrial Engineeringen_US
dc.description.abstractIn a manufacturing environment with volatile demand, inventory management can be coupled with dynamic capacity adjustments for handling the fluctuations more effectively. In this study, we consider the problem of integrated capacity and inventory management under non-stationary stochastic demand and capacity uncertainty. The capacity planning problem is investigated from the workforce planning perspective where the capacity can be temporarily increased by utilising contingent workers from an external labour supply agency. The contingent capacity received from the agency is subject to an uncertainty, but the supply of a certain number of workers can be guaranteed through contracts. There may also be uncertainty in the availability of the permanent and contracted workers due to factors such as absenteeism and fatigue. We formulate a dynamic programming model to make the optimal capacity decisions at a tactical level (permanent workforce size and contracted number of workers) as well as the operational level (number of workers to be requested from the external labour supply agency in each period), integrated with the optimal operational decision of how much to produce in each period. We analyse the characteristics of the optimal policies and we conduct an extensive numerical analysis that helps us provide several managerial insights.en_US
dc.description.provenanceMade available in DSpace on 2016-02-08T10:05:50Z (GMT). No. of bitstreams: 1 bilkent-research-paper.pdf: 70227 bytes, checksum: 26e812c6f5156f83f0e77b261a471b5a (MD5) Previous issue date: 2009en
dc.identifier.doi10.1080/00207540801930237en_US
dc.identifier.eissn1366-588X
dc.identifier.issn0020-7543
dc.identifier.urihttp://hdl.handle.net/11693/22866
dc.language.isoEnglishen_US
dc.publisherTaylor & Francisen_US
dc.relation.isversionofhttp://dx.doi.org/10.1080/00207540801930237en_US
dc.source.titleInternational Journal of Production Researchen_US
dc.subjectCapacity managementen_US
dc.subjectFlexible capacityen_US
dc.subjectInventoryen_US
dc.subjectSupply uncertaintyen_US
dc.subjectWorkforce availabilityen_US
dc.subjectCapacity managementen_US
dc.titleIntegrated workforce capacity and inventory management under labour supply uncertaintyen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Integrated_workforce_capacity_and_inventory_management_under_labour_supply_uncertainty.pdf
Size:
523.75 KB
Format:
Adobe Portable Document Format
Description:
Full printable version