Medium range production planning of "Tacer" company: a case study

buir.advisorMercan, Murat
dc.contributor.authorSüer, Burak
dc.date.accessioned2016-01-08T20:11:11Z
dc.date.available2016-01-08T20:11:11Z
dc.date.issued1994
dc.descriptionCataloged from PDF version of article.en_US
dc.descriptionIncludes bibliographical references.en_US
dc.description.abstractIn order to foresee the potential problems related with production, a production plan is undertaken for the year 1994. Product classification is determined according to the annual sales volume of the company "Tacer". A production schedule is prepared in relation with the forecast data of 1994. The schedule is examined by capacity requirements and financial analysis. Some capacity problems that are highlighted were investigated in the analysis section. Short and long term solutions were made to overcome the insufficient capacityen_US
dc.description.statementofresponsibilitySüer, Buraken_US
dc.format.extentvi, 79 leavesen_US
dc.identifier.urihttp://hdl.handle.net/11693/17540
dc.language.isoEnglishen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subject.lccTS176 .S84 1994en_US
dc.subject.lcshProduction planning.en_US
dc.subject.lcshProduction control.en_US
dc.subject.lcshManufacturing processes.en_US
dc.titleMedium range production planning of "Tacer" company: a case studyen_US
dc.typeThesisen_US
thesis.degree.disciplineBusiness Administration
thesis.degree.grantorBilkent University
thesis.degree.levelMaster's
thesis.degree.nameMBA (Master of Business Administration)

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
B026997.pdf
Size:
1.78 MB
Format:
Adobe Portable Document Format
Description:
Full printable version