Item Open Access Utilization of critical path method in the planning of İzmir Winery Wastewater Treatment Plant(1990) Bodur, İbrahim VolkanCritical Path Method (CPM) is an economic and useful tool to aid managers during preparation and application of projects for scheduling, giving control and coordination, and solving the problems. In this study, CPM is applied to İzmir Winery Wastewater Treatment Plant. A schedule is calculated by CPM and its network diagram and bar chart of ,works is prepared with the Primavera Project Planner which-is a project management and control software.