Cyclic scheduling of a 2-machine robotic cell with tooling constraints

dc.citation.epage796en_US
dc.citation.issueNumber2en_US
dc.citation.spage777en_US
dc.citation.volumeNumber174en_US
dc.contributor.authorGultekin, H.en_US
dc.contributor.authorAkturk, M. S.en_US
dc.contributor.authorKarasan, O. E.en_US
dc.date.accessioned2016-02-08T10:17:37Z
dc.date.available2016-02-08T10:17:37Z
dc.date.issued2006en_US
dc.departmentDepartment of Industrial Engineeringen_US
dc.description.abstractIn this study, we deal with the robotic cell scheduling problem with two machines and identical parts. In an ideal FMS, CNC machines are capable of performing all the required operations as long as the required tools are stored in their tool magazines. However, this assumption may be unrealistic at times since the tool magazines have limited capacity and in many practical instances the required number of tools exceeds this capacity. In this respect, our study assumes that some operations can only be processed on the first machine while some others can only be processed on the second machine due to tooling constraints. Remaining operations can be processed on either machine. The problem is to find the allocation of the remaining operations to the machines and the optimal robot move cycle that jointly minimize the cycle time. We prove that the optimal solution is either a 1-unit or a 2-unit robot move cycle and we present the regions of optimality. Finally, a sensitivity analysis on the results is conducted.en_US
dc.description.provenanceMade available in DSpace on 2016-02-08T10:17:37Z (GMT). No. of bitstreams: 1 bilkent-research-paper.pdf: 70227 bytes, checksum: 26e812c6f5156f83f0e77b261a471b5a (MD5) Previous issue date: 2006en
dc.identifier.doi10.1016/j.ejor.2005.03.021en_US
dc.identifier.eissn1872-6860
dc.identifier.issn0377-2217
dc.identifier.urihttp://hdl.handle.net/11693/23692
dc.language.isoEnglishen_US
dc.publisherElsevieren_US
dc.relation.isversionofhttp://dx.doi.org/10.1016/j.ejor.2005.03.021en_US
dc.source.titleEuropean Journal of Operational Researchen_US
dc.subjectAutomated systemsen_US
dc.subjectProduction schedulingen_US
dc.subjectRobotic cellen_US
dc.titleCyclic scheduling of a 2-machine robotic cell with tooling constraintsen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Cyclic_scheduling_of_a_2-machine_robotic_cell_with_tooling_constraints.pdf
Size:
271.42 KB
Format:
Adobe Portable Document Format
Description:
Full printable version