Robotic cell scheduling with operational flexibility
Date
Authors
Editor(s)
Advisor
Supervisor
Co-Advisor
Co-Supervisor
Instructor
Source Title
Print ISSN
Electronic ISSN
Publisher
Volume
Issue
Pages
Language
Type
Journal Title
Journal ISSN
Volume Title
Citation Stats
Attention Stats
Usage Stats
views
downloads
Series
Abstract
In this paper, we study the problem of two-machine, identical parts robotic cell scheduling with operational flexibility. We assume that every part to be processed has a number of operations to be completed in these two machines and both machines are capable of performing all of the operations. The decision to be made includes finding the optimal robot move cycle and the corresponding optimal allocation of operations to these two machines that jointly minimize the cycle time. We prove that with this definition of the problem 1-unit robot move cycles are no longer necessarily optimal and that according to the given parameters either one of the 1-unit robot move cycles or a 2-unit robot move cycle is optimal. The regions of optimality are presented.