Scheduling with tool changes to minimize total completion time under controllable machining conditions

dc.citation.epage2146en_US
dc.citation.issueNumber7en_US
dc.citation.spage2130en_US
dc.citation.volumeNumber34en_US
dc.contributor.authorAkturk, M. S.en_US
dc.contributor.authorGhosh, J. B.en_US
dc.contributor.authorKayan, R. K.en_US
dc.date.accessioned2015-07-28T11:57:40Z
dc.date.available2015-07-28T11:57:40Z
dc.date.issued2007-07en_US
dc.departmentDepartment of Industrial Engineeringen_US
dc.description.abstractScheduling under controllable machining conditions has been studied for some time. Scheduling with tool changes, particularly due to tool wear, has just begun to receive attention. Though machining conditions impact tool wear and induce tool change, the two issues have not been considered together.We address for the first time the problem of scheduling a computer numerically controlled (CNC) machine subject to tool changes and controllable machining conditions; our objective is to minimize the total completion time of a given set of jobs. We establish an important result that helps us identify feasible settings of machining parameters such as feed rate and cutting speed. However, the problem at hand remains intractable, even when a single setting is used. In the general case, we are able to solve the problem exactly for up to 30 jobs using a mixed integer linear programming formulation. For larger problems, we turn to approximate solution via heuristics. We examine a number of different schemes. The best of these schemes are used in a problem space genetic algorithm; this produces quality solutions in a time-efficient manner, as is evidenced from an extensive computational study conducted by us. 2005 Elsevier Ltd. All rights reserved.en_US
dc.description.provenanceMade available in DSpace on 2015-07-28T11:57:40Z (GMT). No. of bitstreams: 1 10.1016-j.cor.2005.08.014.pdf: 222267 bytes, checksum: 9a05b312575d03a6cfb38ba18947bd9c (MD5)en
dc.identifier.doi10.1016/j.cor.2005.08.014en_US
dc.identifier.eissn1873-765X
dc.identifier.issn0305-0548
dc.identifier.urihttp://hdl.handle.net/11693/11437
dc.language.isoEnglishen_US
dc.publisherElsevieren_US
dc.relation.isversionofhttp://dx.doi.org/10.1016/j.cor.2005.08.014en_US
dc.source.titleComputers and Operations Researchen_US
dc.subjectSchedulingen_US
dc.subjectHeuristicsen_US
dc.subjectCnc Machinesen_US
dc.titleScheduling with tool changes to minimize total completion time under controllable machining conditionsen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Scheduling_with_tool_changes_to_minimize_total_completion_time_under_controllable_machining_conditions.pdf
Size:
217.06 KB
Format:
Adobe Portable Document Format
Description:
Full printable version