Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules
dc.citation.epage | 323 | en_US |
dc.citation.issueNumber | 4 | en_US |
dc.citation.spage | 301 | en_US |
dc.citation.volumeNumber | 5 | en_US |
dc.contributor.author | Sabuncuoglu I. | en_US |
dc.contributor.author | Hommertzheim, D.L. | en_US |
dc.date.accessioned | 2016-02-08T10:54:02Z | |
dc.date.available | 2016-02-08T10:54:02Z | |
dc.date.issued | 1993 | en_US |
dc.department | Department of Industrial Engineering | en_US |
dc.description.abstract | Although extensive research has been conducted to solve design and operational problems of automated manufacturing systems, many of the problems still remain unsolved. This article investigates the scheduling problems of flexible manufacturing systems (FMSs). Specifically, the relative performances of machine and automated guided vehicle (AGV) scheduling rules are analyzed against various due-date criteria. First, the relevant literature is briefly reviewed, and then the rules are tested under different experimental conditions by using a simulation model of an FMS. The sensitivity to AGV workload, buffer capacity, and processing-time distribution is also investigated to assess the robustness of the scheduling rules. © 1993 Kluwer Academic Publishers. | en_US |
dc.description.provenance | Made available in DSpace on 2016-02-08T10:54:02Z (GMT). No. of bitstreams: 1 bilkent-research-paper.pdf: 70227 bytes, checksum: 26e812c6f5156f83f0e77b261a471b5a (MD5) Previous issue date: 1993 | en |
dc.identifier.doi | 10.1007/BF01325033 | en_US |
dc.identifier.issn | 0920-6299 | |
dc.identifier.uri | http://hdl.handle.net/11693/26033 | |
dc.language.iso | English | en_US |
dc.publisher | Kluwer Academic Publishers | en_US |
dc.relation.isversionof | http://dx.doi.org/10.1007/BF01325033 | en_US |
dc.source.title | International Journal of Flexible Manufacturing Systems | en_US |
dc.subject | automated guided vehicles | en_US |
dc.subject | dispatching | en_US |
dc.subject | flexible manufacturing systems | en_US |
dc.subject | scheduling | en_US |
dc.subject | simulation | en_US |
dc.title | Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules | en_US |
dc.type | Article | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Experimental investigation of an FMS due-date scheduling problem Evaluation of machine and AGV scheduling rules.pdf
- Size:
- 1.08 MB
- Format:
- Adobe Portable Document Format
- Description:
- Full printable version