Robotic assembly line design with tool changes

buir.advisorAktürk, M. Selim
dc.contributor.authorTula, Adnan
dc.date.accessioned2016-01-08T18:09:31Z
dc.date.available2016-01-08T18:09:31Z
dc.date.issued2009
dc.departmentDepartment of Industrial Engineeringen_US
dc.descriptionAnkara : The Department of Industrial Engineering and the Institute of Engineering and Sciences of Bilkent University, 2009.en_US
dc.descriptionThesis (Master's) -- Bilkent University, 20009en_US
dc.descriptionIncludes bibliographical references leaves 57-58.en_US
dc.description.abstractThis thesis is focused on assembly line design problems in robotic cells. The mixed-model assembly line design problem that we study has several subproblems such as allocating operations to the stations in the robotic cell and satisfying the demand and cycle time within a desired interval for each model to be produced. We also ensure that assignability, precedence and tool life constraints are met. The existing studies in the literature overlook the limited lives of tools that are used for production in the assembly lines. Furthermore, the studies in the literature do not consider the unavailability periods of the assembly lines and assume that assembly lines work 24 hours a day continuously. In this study, we consider limited lives for the tools and hence we handle tool change decisions. In order to reflect a more realistic production environment, we deal with designing a mixed-model assembly line that works 24 hours a day in three 8-hour shifts and we consider lunch and tea breaks that are present in each shift. This study is the first one to propose using such breaks as tool change periods and hence eliminate tool change related line stoppages. In this setting, we determine the number of stations, operation allocations and tool change decisions jointly. We provide a heuristic algorithm for our problem and test the performances of our heuristic algorithm and DICOPT and CPLEX solvers included in GAMS software on different instances with varying problem parameters.en_US
dc.description.degreeM.S.en_US
dc.description.statementofresponsibilityTula, Adnanen_US
dc.format.extentix, 61 leavesen_US
dc.identifier.urihttp://hdl.handle.net/11693/14850
dc.language.isoEnglishen_US
dc.publisherBilkent Universityen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectRobotic cellen_US
dc.subjectheuristic algorithmen_US
dc.subjecttool changeen_US
dc.subjectassembly lineen_US
dc.subject.lccTJ211 .T85 2009en_US
dc.subject.lcshRobotics.en_US
dc.subject.lcshScheduling (Management)--Mathematical models.en_US
dc.subject.lcshProduction scheduling--Mathematical models.en_US
dc.titleRobotic assembly line design with tool changesen_US
dc.typeThesisen_US

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
0003792.pdf
Size:
554.11 KB
Format:
Adobe Portable Document Format