Automated robotic assembly line design with unavailability periods and tool changes
dc.citation.epage | 526 | en_US |
dc.citation.issueNumber | 4 | en_US |
dc.citation.spage | 499 | en_US |
dc.citation.volumeNumber | 10 | en_US |
dc.contributor.author | Gultekin, H. | en_US |
dc.contributor.author | Tula, A. | en_US |
dc.contributor.author | Akturk, M. S. | en_US |
dc.date.accessioned | 2019-02-21T12:56:07Z | |
dc.date.available | 2019-02-21T12:56:07Z | |
dc.date.issued | 2016 | en_US |
dc.department | Department of Industrial Engineering | en_US |
dc.description.abstract | We focus on an assembly line design problem of a fully automated robotic spot-welding line. Different from existing studies, we take the prescheduled unavailability periods, such as lunch and tea breaks, into account in order to reflect a more realistic production environment. This problem includes allocating operations to the stations and satisfying the demand and cycle time within a desired interval for each model to be produced. We also ensure that assignability, precedence, and tool life constraints are met. Furthermore, the existing studies in the literature overlook the limited lives of the tools that are used for production. Tool replacement decisions not only affect the tooling cost, but also the production rate. Therefore, we determine the number of stations and allocate the operations into the stations in such a way that tool change periods coincide with the unavailability periods to eliminate tool change related line stoppages in a mixed model robotic assembly line. We provide a mathematical formulation, propose a two-stage local search algorithm and test the performances of these methods using different problem instances with varying parameters. [Received: 12 November 2012; Revised: 8 February 2016; Accepted: 18 February 2016] | en_US |
dc.description.provenance | Submitted by Burcu Böke (tburcu@bilkent.edu.tr) on 2019-02-21T12:56:07Z No. of bitstreams: 1 Automated_robotic_assembly_line_design_with_unavailability_periods_and_tool_changes.pdf: 824334 bytes, checksum: b1fe0cd01ad112017ab43290b7ba7fcc (MD5) | en |
dc.description.provenance | Made available in DSpace on 2019-02-21T12:56:07Z (GMT). No. of bitstreams: 1 Automated_robotic_assembly_line_design_with_unavailability_periods_and_tool_changes.pdf: 824334 bytes, checksum: b1fe0cd01ad112017ab43290b7ba7fcc (MD5) Previous issue date: 2016 | en |
dc.identifier.doi | 10.1504/EJIE.2016.078142 | en_US |
dc.identifier.eissn | 1751-5262 | |
dc.identifier.issn | 1751-5254 | |
dc.identifier.uri | http://hdl.handle.net/11693/49642 | |
dc.language.iso | English | en_US |
dc.publisher | Inderscience Publishers | en_US |
dc.relation.isversionof | https:doi.org/10.1504/EJIE.2016.078142 | en_US |
dc.source.title | European Journal of Industrial Engineering | en_US |
dc.subject | Robotic assembly line | en_US |
dc.subject | Line balancing | en_US |
dc.subject | Automobile industry | en_US |
dc.subject | Mathematical programming | en_US |
dc.subject | Local search algorithm | en_US |
dc.title | Automated robotic assembly line design with unavailability periods and tool changes | en_US |
dc.type | Article | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Automated_robotic_assembly_line_design_with_unavailability_periods_and_tool_changes.pdf
- Size:
- 805.01 KB
- Format:
- Adobe Portable Document Format
- Description:
- Full printable version
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: