Scheduling in a three-machine flexible robotic cell
Date
2006
Editor(s)
Advisor
Supervisor
Co-Advisor
Co-Supervisor
Instructor
BUIR Usage Stats
1
views
views
20
downloads
downloads
Citation Stats
Series
Abstract
In this study, a three-machine flexible robotic manufacturing cell in which the CNC machines are used is considered. These machines are highly flexible and are capable of performing several different operations. Each machine is assumed to be capable of performing all of the required operations of each part. As a consequence of this assumption, a new class of cycles is defined and three simple and widely used cycles among this class is proposed. The regions of optimality for these cycles as well as the worst case performances are derived.
Source Title
Proceedings of the 12th IFAC Symposium on Information Control Problems in Manufacturing, 2006
Publisher
IFAC
Course
Other identifiers
Book Title
Degree Discipline
Degree Level
Degree Name
Citation
Permalink
Published Version (Please cite this version)
Language
English