The general behavior of pull production systems: the allocation problems

dc.citation.epage494en_US
dc.citation.issueNumber2en_US
dc.citation.spage479en_US
dc.citation.volumeNumber119en_US
dc.contributor.authorKırkavak, N.en_US
dc.contributor.authorDinçer, C.en_US
dc.date.accessioned2016-02-08T10:40:14Z
dc.date.available2016-02-08T10:40:14Z
dc.date.issued1999en_US
dc.departmentDepartment of Industrial Engineeringen_US
dc.description.abstractThe design of tandem production systems has been well studied in the literature with the primary focus being on how to improve their e ciency. Considering the large costs associated, a slight improvement in e ciency can lead to very signi®cant savings over its life. Division of work and allocation of bu er capacities between workstations are two critical design problems that have attracted the attention of many researchers. In this study, ®rst an understanding into how the system works is to be provided. Except for the integration of two allocation problems, the basic model utilized here is essentially the same as the previous studies. Theoretical results that characterize the dynamics of these systems may also provide some heuristic support in the analysis of large-scale pull production systems. Ó 1999 Elsevier Science B.V. All rights reserved.en_US
dc.description.provenanceMade available in DSpace on 2016-02-08T10:40:14Z (GMT). No. of bitstreams: 1 bilkent-research-paper.pdf: 70227 bytes, checksum: 26e812c6f5156f83f0e77b261a471b5a (MD5) Previous issue date: 1999en
dc.identifier.doi10.1016/S0377-2217(99)00148-4en_US
dc.identifier.issn0377-2217
dc.identifier.urihttp://hdl.handle.net/11693/25168
dc.language.isoEnglishen_US
dc.publisherElsevieren_US
dc.relation.isversionofhttp://dx.doi.org/10.1016/S0377-2217(99)00148-4en_US
dc.source.titleEuropean Journal of Operational Researchen_US
dc.subjectComputer simulationen_US
dc.subjectCost effectivenessen_US
dc.subjectEfficiencyen_US
dc.subjectHeuristic programmingen_US
dc.subjectInventory controlen_US
dc.subjectMarkov processesen_US
dc.subjectPerformanceen_US
dc.subjectResource allocationen_US
dc.subjectThroughputen_US
dc.subjectPerformance evaluationen_US
dc.subjectPull production systemsen_US
dc.subjectThroughput maximizationen_US
dc.subjectProductionen_US
dc.titleThe general behavior of pull production systems: the allocation problemsen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
General behavior of pull production systems the allocation problems.pdf
Size:
518.31 KB
Format:
Adobe Portable Document Format
Description:
Full printable version