Meeting correlated spare part demands with optimal transshipments

Date

2010

Authors

Çömez, N.
Stecke, K. E.
Çakanyıldırım, M.

Editor(s)

Advisor

Supervisor

Co-Advisor

Co-Supervisor

Instructor

Source Title

International Journal of Strategic Decision Sciences

Print ISSN

1947-8569

Electronic ISSN

1947-8577

Publisher

IGI Global

Volume

1

Issue

2

Pages

1 - 27

Language

English

Journal Title

Journal ISSN

Volume Title

Series

Abstract

This paper studies spare part transshipments between two service part facilities whose demands are correlated. Transshipments are used to reduce severity of part stock outs. Facilities are run by an inventory manager (IM) who minimizes replenishment, transshipment, and inventory costs. We show that the optimal transshipment policy is an inventory hold-back type; if the part inventory at a facility is less than or equal to its hold-back level, a transshipment request made for that part by a stocked out retailer is rejected. The hold-back levels increase toward the next replenishment of partsThis implies that transshipment requests are initially accepted until a critical time and afterwards they are rejected. A heuristic is designed using this critical time as the single decision variable. It performs within 0.7-1.8% of the optimal cost. Heuristic policies of no inventory sharing and complete sharing, respectively, perform within 3% and 2% of the optimal cost. Since the computation of hold-back levels and implementation of the optimal transshipments, respectively, require limited resources and little IM oversight, we advocate for the use of the optimal transshipment policy.

Course

Other identifiers

Book Title

Citation