Beam search based algorithm for scheduling machines and AGVs in an FMS

Date

1993

Editor(s)

Advisor

Supervisor

Co-Advisor

Co-Supervisor

Instructor

Source Title

Proceedings of the 2nd Industrial Engineering Research Conference, IERC 1993

Print ISSN

Electronic ISSN

Publisher

Institute for Industrial Engineers

Volume

Issue

Pages

308 - 312

Language

English

Type

Conference Paper

Journal Title

Journal ISSN

Volume Title

Series

Abstract

This paper presents a beam search based scheduling algorithm for a random FMS. The proposed algorithm considers finite buffer capacity, routing and sequence flexibilities and generates machine and AGV schedules in varying time windows. The performance of the algorithm is measured using makespan, flow time, and tardiness criteria under various experimental conditions.

Course

Other identifiers

Book Title

Keywords

Algorithms, Materials handling equipment, Production control, Scheduling, Beam search based scheduling algorithm, Finite buffer capacity, Materials handling routes, Rolling time windows, Sequences flexibilities, Flexible manufacturing systems

Citation

item.page.isversionof