Integration of shipment scheduling decisions for forward and reverse channels in a recoverable item system

dc.citation.epage137en_US
dc.citation.issueNumber1en_US
dc.citation.spage129en_US
dc.citation.volumeNumber140en_US
dc.contributor.authorToptal, A.en_US
dc.date.accessioned2015-07-28T12:00:52Z
dc.date.available2015-07-28T12:00:52Z
dc.date.issued2012-11en_US
dc.departmentDepartment of Industrial Engineeringen_US
dc.description.abstractIn this paper, we consider the problem of finding the economic shipment quantities of failed and recovered items between a central depot and a collection center to coordinate the flow in both ways. Our model takes an explicit account for the transportation costs and capacities under the assumption of deterministic failure rate of items. The proposed solution provides the optimum shipment quantities, and the level of spare items to be held at the collection center with the objective of minimizing the long-run average total costs subject to a service level.en_US
dc.description.provenanceMade available in DSpace on 2015-07-28T12:00:52Z (GMT). No. of bitstreams: 1 10.1016-j.ijpe.2011.06.014.pdf: 474008 bytes, checksum: 2d6010cd72f032aefe819bf7868d2299 (MD5)en
dc.identifier.doi10.1016/j.ijpe.2011.06.014en_US
dc.identifier.issn0925-5273
dc.identifier.urihttp://hdl.handle.net/11693/12268
dc.language.isoEnglishen_US
dc.publisherElsevieren_US
dc.relation.isversionofhttp://dx.doi.org/10.1016/j.ijpe.2011.06.014en_US
dc.source.titleInternational Journal of Production Economicsen_US
dc.subjectAcceptabilityen_US
dc.subjectContingent Claimen_US
dc.subjectIncomplete Marketsen_US
dc.subjectMartingale Measureen_US
dc.subjectPricingen_US
dc.subjectRecoverable Itemen_US
dc.subjectSpare Inventoryen_US
dc.subjectTransportationen_US
dc.subjectCargo Capacityen_US
dc.titleIntegration of shipment scheduling decisions for forward and reverse channels in a recoverable item systemen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Integration_of_shipment_scheduling_decisions_for_forward_and_reverse_channels_in_a_recoverable_item_system.pdf
Size:
462.9 KB
Format:
Adobe Portable Document Format
Description:
Full printable version