Match-up scheduling under a machine breakdown
dc.citation.epage | 97 | en_US |
dc.citation.issueNumber | 1 | en_US |
dc.citation.spage | 81 | en_US |
dc.citation.volumeNumber | 112 | en_US |
dc.contributor.author | Aktürk, M. S. | en_US |
dc.contributor.author | Görgülü, E. | en_US |
dc.date.accessioned | 2016-02-08T10:42:28Z | |
dc.date.available | 2016-02-08T10:42:28Z | |
dc.date.issued | 1999 | en_US |
dc.department | Department of Industrial Engineering | en_US |
dc.description.abstract | When a machine breakdown forces a modified flow shop (MFS) out of the prescribed state, the proposed strategy reschedules part of the initial schedule to match up with the preschedule at some point. The objective is to create a new schedule that is consistent with the other production planning decisions like material flow, tooling and purchasing by utilizing the time critical decision making concept. We propose a new rescheduling strategy and a match-up point determination procedure through a feedback mechanism to increase both the schedule quality and stability. The proposed approach is compared with alternative reactive scheduling methods under different experimental settings. © 1999 Elsevier Science B.V. All rights reserved. | en_US |
dc.description.provenance | Made available in DSpace on 2016-02-08T10:42:28Z (GMT). No. of bitstreams: 1 bilkent-research-paper.pdf: 70227 bytes, checksum: 26e812c6f5156f83f0e77b261a471b5a (MD5) Previous issue date: 1999 | en |
dc.identifier.doi | 10.1016/S0377-2217(97)00396-2 | en_US |
dc.identifier.issn | 0377-2217 | |
dc.identifier.uri | http://hdl.handle.net/11693/25298 | |
dc.language.iso | English | en_US |
dc.publisher | Elsevier | en_US |
dc.relation.isversionof | https://doi.org/10.1016/S0377-2217(97)00396-2 | en_US |
dc.source.title | European Journal of Operational Research | en_US |
dc.subject | Branch and bound | en_US |
dc.subject | Heuristics | en_US |
dc.subject | Scheduling | en_US |
dc.subject | Decision making | en_US |
dc.subject | Decision theory | en_US |
dc.subject | Heuristic methods | en_US |
dc.subject | Process control | en_US |
dc.subject | Purchasing | en_US |
dc.subject | Quality assurance | en_US |
dc.subject | Scheduling | en_US |
dc.subject | Strategic planning | en_US |
dc.subject | Branch and bound methods | en_US |
dc.subject | Modified flow shops (MFS) | en_US |
dc.subject | Production control | en_US |
dc.title | Match-up scheduling under a machine breakdown | en_US |
dc.type | Article | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Match-up scheduling under a machine breakdown.pdf
- Size:
- 342.61 KB
- Format:
- Adobe Portable Document Format
- Description:
- Full printable version