Integrated scheduling and tool management in flexible manufacturing cells

buir.advisorAktürk, Selim
dc.contributor.authorÖzkan, Serkan
dc.date.accessioned2016-01-08T20:14:42Z
dc.date.available2016-01-08T20:14:42Z
dc.date.issued1997
dc.descriptionAnkara : Department of Industrial Engineering and the Institute of Engineering and Sciences of Bilkent University, 1997.en_US
dc.descriptionThesis (Master's) -- Bilkent University, 1997.en_US
dc.descriptionIncludes bibliographical references leaves 100-106.en_US
dc.description.abstractA flexible inanufaciuring cell (l''M(J) is designed to combine the efiiciency of a liigli j)roduction line and the ih'xibility of a job shop to best suit the batch production of ruid-volume and mid variety of products. In view of the high investment and operating costs of h'lVICs, attention should be pa.id to their eifective utilization. Their eircctivc'iiess is, however, directly related to their design and operational strategies. In this study, we propose a.n iutegra.ted algoritlim tliat will solve the scheduling and the tool management problems in an FMC. There will be three stages in the algorithm. The first stage will perform the tool allocation. The second stage will find an initial schedule, and the final stage will finalize tlie schedule via cojitrollable proc(Wsiug times. The main objective of the ju'oposed aigorithiu is to minimize' total pioductiou cost coiisisting of tooling cost, operaXional cost and tardiness cost..en_US
dc.description.provenanceMade available in DSpace on 2016-01-08T20:14:42Z (GMT). No. of bitstreams: 1 1.pdf: 78510 bytes, checksum: d85492f20c2362aa2bcf4aad49380397 (MD5)en
dc.description.statementofresponsibilityÖzkan, Serkanen_US
dc.format.extentxvi, 144 leavesen_US
dc.identifier.urihttp://hdl.handle.net/11693/17932
dc.language.isoEnglishen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectFlexilrle manufacturing cellen_US
dc.subjectscliedulingen_US
dc.subjectcontrollalle processing timesen_US
dc.subjecttool managementen_US
dc.subject.lccTS155.65 .O95 1997en_US
dc.subject.lcshFlexible manufacturing systems--Mathematical models.en_US
dc.subject.lcshProduction planning.en_US
dc.subject.lcshProduction management--Mathematical models.en_US
dc.titleIntegrated scheduling and tool management in flexible manufacturing cellsen_US
dc.typeThesisen_US
thesis.degree.disciplineIndustrial Engineering
thesis.degree.grantorBilkent University
thesis.degree.levelMaster's
thesis.degree.nameMS (Master of Science)

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
B038369.pdf
Size:
4.29 MB
Format:
Adobe Portable Document Format
Description:
Full printable version