Lot streaming in multi stage shops

buir.advisorBenli, S. Ömer
dc.contributor.authorŞen, Alper
dc.date.accessioned2016-01-08T20:11:22Z
dc.date.available2016-01-08T20:11:22Z
dc.date.issued1994
dc.descriptionAnkara : The Department of Industrial Engineering and the Institute of Engineering and Sciences of Bilkent Univ., 1994.en_US
dc.descriptionThesis (Master's) -- Bilkent University, 1994.en_US
dc.descriptionIncludes bibliographical references.en_US
dc.description.abstractIn this thesis, a number of lot streaming problems in flow, open and job shops are investigated. Lot streaming is the process of splitting a job to allow for overlapping of its operations on various machines resulting in shorter completion times. When there is a single job, the problem is to find the size of the transfer batches (“sublots”) which minimizes a given performance measure (e.g., makespan, mean flow time). Multi-job problems are harder, since sequencing and sizing decisions must be made simultaneously. Most of the current research in lot streaming is concerned with minimum makespan problems in flow shops. In this study, other performance measures and shop structures are also analyzed. Optimal sublot sizes are derived for the single job two machine flow shop mean flow time problem. Solution methods are proposed for the minimum makespan problem in open shops both for multiple job and single job cases.en_US
dc.description.provenanceMade available in DSpace on 2016-01-08T20:11:22Z (GMT). No. of bitstreams: 1 1.pdf: 78510 bytes, checksum: d85492f20c2362aa2bcf4aad49380397 (MD5)en
dc.description.statementofresponsibilityŞen, Alperen_US
dc.format.extentxi, 59 leavesen_US
dc.identifier.urihttp://hdl.handle.net/11693/17555
dc.language.isoEnglishen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectSchedulingen_US
dc.subjectJob Shopsen_US
dc.subjectOpen Shopsen_US
dc.subjectFlow Shopsen_US
dc.subjectLot Streamingen_US
dc.subject.lccTS157.5 .S46 1994en_US
dc.subject.lcshScheduling (Management)--Mathematical models.en_US
dc.subject.lcshJob shops.en_US
dc.subject.lcshProduction scheduling.en_US
dc.titleLot streaming in multi stage shopsen_US
dc.typeThesisen_US
thesis.degree.disciplineIndustrial Engineering
thesis.degree.grantorBilkent University
thesis.degree.levelMaster's
thesis.degree.nameMS (Master of Science)

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
B005200.pdf
Size:
2.02 MB
Format:
Adobe Portable Document Format
Description:
Full printable version