A comparative study of computational procedures for resource constrained project scheduling problem

buir.advisorOğuz, Osman
dc.contributor.authorBala, Hasan
dc.date.accessioned2016-01-08T20:09:17Z
dc.date.available2016-01-08T20:09:17Z
dc.date.issued1991
dc.departmentDepartment of Industrial Engineeringen_US
dc.descriptionAnkara : Department of Industrial Engineering and Institute of Engineering and Sciences, Bilkent Univ., 1991.en_US
dc.descriptionThesis (Master's) -- Bilkent University, 1991.en_US
dc.descriptionIncludes bibliographical references.en_US
dc.description.abstractCustomarily, the project sclheduling problem is thought in the context of PERT and CPM. Although widely used and powerful, these techniques do not take into account a basic feature of the problem, that is resource limitations. The problem addressed in this study is to schedule the activities of a single project in order that all resource and precedence relationships constraints are satisfied with an objective of minimizing total of activity completion times. Our purpose is to make a computational comparison of some solution procedures for the problem. Firstly, the 0 - 1 formulation of the problem is introduced together with the underlying assumptions. Then, we describe the solution procedures tested in this study. In order to evaluate them, the random activity networks are generated. Finally, we provide the results and conclusions.en_US
dc.description.degreeM.S.en_US
dc.description.statementofresponsibilityBala, Hasanen_US
dc.format.extentxii, 44 leavesen_US
dc.identifier.urihttp://hdl.handle.net/11693/17328
dc.language.isoEnglishen_US
dc.publisherBilkent Universityen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectProject Managementen_US
dc.subjectHeuristcs.en_US
dc.subjectSchedulingen_US
dc.subject.lccTS157.5 .B35 1991en_US
dc.subject.lcshProduction scheduling.en_US
dc.subject.lcshIndustrial project management.en_US
dc.subject.lcshProduction scheduling--Mathematical models.en_US
dc.titleA comparative study of computational procedures for resource constrained project scheduling problemen_US
dc.typeThesisen_US

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
B008637.pdf
Size:
1.34 MB
Format:
Adobe Portable Document Format
Description:
Full printable version