Discrete time/cost trade-off problem: a decomposition-based solution algorithm for the budget version

Date

2010-04

Authors

Hazır, O.
Haouari, M.
Erel, E.

Editor(s)

Advisor

Supervisor

Co-Advisor

Co-Supervisor

Instructor

Source Title

Computers and Operations Research

Print ISSN

0305-0548

Electronic ISSN

Publisher

Pergamon Press

Volume

37

Issue

4

Pages

649 - 655

Language

English

Journal Title

Journal ISSN

Volume Title

Series

Abstract

This paper investigates the budget variant of the discrete time/cost trade-off problem (DTCTP). This multi-mode project scheduling problem requires assigning modes to the activities of a project so that the total completion time is minimized and the budget and the precedence constraints are satisfied. This problem is often encountered in practice as timely completion of the projects without exceeding the budget is crucial. The contribution of this paper to the literatures is to describe an effective Benders Decomposition-based exact algorithm to solve the DTCTP instances of realistic sizes. Although Benders Decomposition often exhibits a very slow convergence, we have included several algorithmic features to enhance the performance of the proposed tailored approach. Computational results attest to the efficacy of the proposed algorithm, which can solve large-scale instances to optimality.

Course

Other identifiers

Book Title

Citation