Browsing by Subject "Undirected network"
Now showing 1 - 2 of 2
- Results Per Page
- Sort Options
Item Open Access New formulations for the hop-constrained minimum spanning tree problem via Sherali and Driscoll's tightened Miller-Tucker-Zemlin constraints(Elsevier, 2010) Akgün, İbrahimGiven an undirected network with positive edge costs and a natural number p, the hop-constrained minimum spanning tree problem (HMST) is the problem of finding a spanning tree with minimum total cost such that each path starting from a specified root node has no more than p hops (edges). In this paper, the new models based on the Miller-Tucker-Zemlin (MTZ) subtour elimination constraints are developed and computational results together with comparisons against MTZ-based, flow-based, and hop-indexed formulations are reported. The first model is obtained by adapting the MTZ-based Asymmetric Traveling Salesman Problem formulation of Sherali and Driscoll [18] and the other two models are obtained by combining topology-enforcing and MTZ-related constraints offered by Akgün and Tansel (submitted for publication) [20] for HMST with the first model appropriately. Computational studies show that the best LP bounds of the MTZ-based models in the literature are improved by the proposed models. The best solution times of the MTZ-based models are not improved for optimally solved instances. However, the results for the harder, large-size instances imply that the proposed models are likely to produce better solution times. The proposed models do not dominate the flow-based and hop-indexed formulations with respect to LP bounds. However, good feasible solutions can be obtained in a reasonable amount of time for problems for which even the LP relaxations of the flow-based and hop-indexed formulations can be solved in about 2 days. © 2010 Elsevier Ltd. All rights reserved.Item Open Access On the Delay Margin for Consensus in Directed Networks of Anticipatory Agents(Elsevier B.V., 2016) Irofti D.; Atay, F. M.We consider a linear consensus problem involving a time delay that arises from predicting the future states of agents based on their past history. In case the agents are coupled in a connected and undirected network, the exact condition for consensus is that the delay be less than a constant threshold that is independent of the network topology or size. In directed networks, however, the situation is quite different. We show that the allowable maximum delay for consensus depends on the network topology in a nontrivial way. We study this delay margin in several network constellations, including various circulant networks with directed links. We show that the delay margin depends not only on the number of neighbors, but also on the directionality of connections with those neighbors. Furthermore, the delay margin improves as the circulant networks are rewired en route to a small-world configuration. © 2016