BUIR logo
Communities & Collections
All of BUIR
  • English
  • Türkçe
Log In
Please note that log in via username/password is only available to Repository staff.
Have you forgotten your password?
  1. Home
  2. Browse by Subject

Browsing by Subject "Stochastic Dynamic Programming"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • Loading...
    Thumbnail Image
    ItemOpen Access
    Integrated flexible capacity and inventory management under flexible capacity uncertainty
    (2006) Paç, Mehmet Fazıl
    In a manufacturing environment with volatile demand, inventory management can be coupled with dynamic capacity adjustments for handling the fluctuations more effectively. In this study we consider the integrated management of inventory and flexible capacity management under seasonal stochastic demand and uncertain labor supply. The capacity planning problem is investigated from the workforce planning perspective. We consider a manufacturing firm that can temporarily increase its production capacity by utilizing contingent workers from an external labor supply agency. The uncertainty of contingent capacity arises from the (un)availability of contingent workers, the pool size and the behavior of the labor supply agency. Using a dynamic programming approach, we formulate an infinite horizon model determining the optimal levels of permanent and contracted capacity, in order to minimize the total cost of operations. Within the dynamic program, we determine the optimal operational capacity decisions, namely the size of contracted and contingent capacity to be utilized in each period. The characteristics of the optimal policies are analyzed under an infinite horizon setting. In addition we consider temporary labor contracts, that diminish the effects of supply uncertainty on the manufacturer, at a specific contracting cost. Our analysis shows that as the supply uncertainty and/or the expected cost of utilizing contingent workers increase, the value of temporary labor contracts also increase. In contrast increasing demand variability reduces the incentive of the manufacturer to own capacity and increases the utilization of contingent resources.

About the University

  • Academics
  • Research
  • Library
  • Students
  • Stars
  • Moodle
  • WebMail

Using the Library

  • Collections overview
  • Borrow, renew, return
  • Connect from off campus
  • Interlibrary loan
  • Hours
  • Plan
  • Intranet (Staff Only)

Research Tools

  • EndNote
  • Grammarly
  • iThenticate
  • Mango Languages
  • Mendeley
  • Turnitin
  • Show more ..

Contact

  • Bilkent University
  • Main Campus Library
  • Phone: +90(312) 290-1298
  • Email: dspace@bilkent.edu.tr

Bilkent University Library © 2015-2025 BUIR

  • Privacy policy
  • Send Feedback