Browsing by Subject "Computer integrated manufacturing"
Now showing 1 - 3 of 3
- Results Per Page
- Sort Options
Item Open Access Integrated scheduling and tool management in flexible manufacturing systems(Taylor & Francis, 2001) Aktürk, M. S.; Özkan, S.A multistage algorithm is proposed that will solve the scheduling problem in a flexible manufacturing system by considering the interrelated subproblems of processing time control, tool allocation and machining conditions optimization. The main objective of the proposed algorithm is to minimize total production cost consisting of tooling, operational and tardiness costs. The proposed integrated approach recognizes an important trade-off in automated manufacturing systems that has been largely unrecognized, and which is believed can be effectively exploited to improve production efficiency and lead to substantial cost reductions.Item Open Access Joint lot sizing and tool management in a CNC environment(Elsevier, 1999) Aktuük, M. S.; Önen, S.We propose a new algorithm to solve lot sizing, tool allocation and machining conditions optimization problems simultaneously to minimize total production cost in a CNC environment. Most of the existing lot sizing and tool management methods solve these problems independently using a two-level optimization approach. Thus, we not only improve the overall solution by exploiting the interactions among these decision making problems, but also prevent any infeasibility that might occur for the tool management problem due to decisions made at the lot sizing level. The computational experiments showed that in a set of randomly generated problems 22.5% of solutions found by the two-level approach were infeasible and the proposed joint approach improved the solution on the average by 6.79% for the remaining cases.Item Open Access An overview of design and operational issues of kanban systems(Taylor & Francis, 1999) Aktürk, M. S.; Erhun, F.We present a literature review and classification of techniques to determine both the design parameters and kanban sequences for just-in-time manufacturing systems. We summarize the model structures, decision variables, performance measures and assumptions in a tabular format. It is important to state that there is a significant relationship between the design parameters, such as the number of kanbans and kanban sizes, and the scheduling decisions in a multi-item, multi-stage, multi-horizon kanban system. An experimental design is developed to evaluate the impact of operational issues, such as sequencing rules and actual lead times on the design parameters.