Browsing by Subject "Approximation scheme"
Now showing 1 - 2 of 2
- Results Per Page
- Sort Options
Item Open Access FPTAS for half-products minimization with scheduling applications(Elsevier, 2008) Erel, E.; Ghosh, J. B.A special class of quadratic pseudo-boolean functions called "half-products" (HP) has recently been introduced. It has been shown that HP minimization, while NP-hard, admits a fully polynomial time approximation scheme (FPTAS). In this note, we provide a more efficient FPTAS. We further show how an FPTAS can also be derived for the general case where the HP function is augmented by a problem-dependent constant and can justifiably be assumed to be nonnegative. This leads to an FPTAS for certain partitioning type problems, including many from the field of scheduling.Item Open Access Minimizing weighted mean absolute deviation of job completion times from their weighted mean(Elsevier, 2011) Erel, E.; Ghosh, J. B.We address a single-machine scheduling problem where the objective is to minimize the weighted mean absolute deviation of job completion times from their weighted mean. This problem and its precursors aim to achieve the maximum admissible level of service equity. It has been shown earlier that the unweighted version of this problem is NP-hard in the ordinary sense. For that version, a pseudo-polynomial time dynamic program and a 2-approximate algorithm are available. However, not much (except for an important solution property) exists for the weighted version. In this paper, we establish the relationship between the optimal solution to the weighted problem and a related one in which the deviations are measured from the weighted median (rather than the mean) of the job completion times; this generalizes the 2-approximation result mentioned above. We proceed to give a pseudo-polynomial time dynamic program, establishing the ordinary NP-hardness of the problem in general. We then present a fully-polynomial time approximation scheme as well. Finally, we report the findings from a limited computational study on the heuristic solution of the general problem. Our results specialize easily to the unweighted case; they also lead to an approximation of the set of schedules that are efficient with respect to both the weighted mean absolute deviation and the weighted mean completion time. © 2011 Elsevier Inc. All rights reserved.