• About
  • Policies
  • What is open access
  • Library
  • Contact
Advanced search
      View Item 
      •   BUIR Home
      • Scholarly Publications
      • Faculty of Engineering
      • Department of Industrial Engineering
      • View Item
      •   BUIR Home
      • Scholarly Publications
      • Faculty of Engineering
      • Department of Industrial Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Analysis of order review/release problems in production systems

      Thumbnail
      View / Download
      205.6 Kb
      Author(s)
      Sabuncuoglu, İhsan
      Karapınar, H.Y.
      Date
      1999
      Source Title
      International Journal of Production Economics
      Print ISSN
      0925-5273
      Publisher
      Elsevier Science B.V., Amsterdam, Netherlands
      Volume
      62
      Issue
      3
      Pages
      259 - 279
      Language
      English
      Type
      Article
      Item Usage Stats
      214
      views
      218
      downloads
      Abstract
      Order Review/Release (ORR) activities have mostly been ignored in past job shop research. In most previous studies, arriving jobs are immediately released to the shop floor without considering any information about the system or job characteristics. In practice however, these jobs are often first collected in a pool and then released to the system according to a specific criterion. Although practitioners often observe the benefits of ORR, researchers have found limited support for the use of these input regulation policies. One objective of this paper is to examine this research paradox in a capacitated system. We also offer a new classification framework for existing research work. Finally, for the first time in this paper, both periodic and continuous ORR methods are compared simultaneously under various experimental conditions against different performance measures. The results of simulation experiments and statistical tests are also presented in the paper.
      Keywords
      Simulation
      Scheduling
      Job shop
      Order review/release
      Input control
      Permalink
      http://hdl.handle.net/11693/25204
      Published Version (Please cite this version)
      http://dx.doi.org/10.1016/S0925-5273(98)00248-5
      Collections
      • Department of Industrial Engineering 758
      Show full item record

      Browse

      All of BUIRCommunities & CollectionsTitlesAuthorsAdvisorsBy Issue DateKeywordsTypeDepartmentsCoursesThis CollectionTitlesAuthorsAdvisorsBy Issue DateKeywordsTypeDepartmentsCourses

      My Account

      Login

      Statistics

      View Usage StatisticsView Google Analytics Statistics

      Bilkent University

      If you have trouble accessing this page and need to request an alternate format, contact the site administrator. Phone: (312) 290 2976
      © Bilkent University - Library IT

      Contact Us | Send Feedback | Off-Campus Access | Admin | Privacy