• About
  • Policies
  • What is openaccess
  • Library
  • Contact
Advanced search
      View Item 
      •   BUIR Home
      • Scholarly Publications
      • Faculty of Engineering
      • Department of Industrial Engineering
      • View Item
      •   BUIR Home
      • Scholarly Publications
      • Faculty of Engineering
      • Department of Industrial Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Integrated scheduling and tool management in flexible manufacturing systems

      Thumbnail
      View / Download
      530.7 Kb
      Author
      Aktürk, M. S.
      Özkan, S.
      Date
      2001
      Source Title
      International Journal of Production Research
      Print ISSN
      0020-7543
      Electronic ISSN
      1366-588X
      Publisher
      Taylor & Francis
      Volume
      39
      Issue
      12
      Pages
      2697 - 2722
      Language
      English
      Type
      Article
      Item Usage Stats
      120
      views
      93
      downloads
      Abstract
      A multistage algorithm is proposed that will solve the scheduling problem in a flexible manufacturing system by considering the interrelated subproblems of processing time control, tool allocation and machining conditions optimization. The main objective of the proposed algorithm is to minimize total production cost consisting of tooling, operational and tardiness costs. The proposed integrated approach recognizes an important trade-off in automated manufacturing systems that has been largely unrecognized, and which is believed can be effectively exploited to improve production efficiency and lead to substantial cost reductions.
      Keywords
      Algorithms
      C (programming language)
      Computer integrated manufacturing
      Computer simulation
      Cost effectiveness
      Machine tools
      Machining
      Optimization
      Process control
      Program compilers
      Scheduling
      Automated manufacturing systems
      Multistage algorithm
      Single machine operation problem
      Tool allocation
      Flexible manufacturing systems
      Permalink
      http://hdl.handle.net/11693/24824
      Published Version (Please cite this version)
      http://dx.doi.org/10.1080/00207540110051941
      Collections
      • Department of Industrial Engineering 677
      Show full item record

      Browse

      All of BUIRCommunities & CollectionsTitlesAuthorsAdvisorsBy Issue DateKeywordsTypeDepartmentsThis CollectionTitlesAuthorsAdvisorsBy Issue DateKeywordsTypeDepartments

      My Account

      Login

      Statistics

      View Usage StatisticsView Google Analytics Statistics

      Bilkent University

      If you have trouble accessing this page and need to request an alternate format, contact the site administrator. Phone: (312) 290 1771
      Copyright © Bilkent University - Library IT

      Contact Us | Send Feedback | Off-Campus Access | Admin | Privacy