Due date and cost-based FMS loading, scheduling and tool management
Date
2007Source Title
International Journal of Production Research
Print ISSN
0020-7543
Electronic ISSN
1366-588X
Publisher
Taylor & Francis
Volume
45
Issue
5
Pages
1183 - 1213
Language
English
Type
ArticleItem Usage Stats
214
views
views
255
downloads
downloads
Abstract
In this study, we consider flexible manufacturing system loading, scheduling and tool management problems simultaneously. Our aim is to determine relevant tool management decisions, which are machining conditions selection and tool allocation, and to load and schedule parts on non-identical parallel CNC machines. The dual objectives are minimization of the manufacturing cost and total weighted tardiness. The manufacturing cost is comprised of machining and tooling costs (which are affected by machining conditions) and non-machining cost (which is affected by tool replacement decisions). We used both sequential and simultaneous approaches to solve our problem to show the superiority of the simultaneous approach. The proposed heuristics are used in a problem space genetic algorithm in order to generate a series of approximately efficient solutions.
Keywords
Flexible manufacturing systemsLoading
Scheduling
Tool management
Flexible manufacturing systems