ABC Inventory classification application: Özdemirler
(Bilkent University, 1989)ABC inventory classification can result in more effective control of business. In this work, ABC method is applied to Ozdemirler to examine the inventory profile of the store, and to be able to aid the management in ... -
Aggregate production planning: an application in Özkaşıkçı Flour Mill
(Bilkent University, 1996)Aggregate planning is medium-range capacity planning that typically covers a time horizon of anywhere from 3 months to 18 months. The goal of aggregate planning is to achieve a feasible production plan that will effectively ... -
Analysis of the daily replenishment information system of an international company: a case study
(Bilkent University, 1997)In this thesis, an implementation of Information Systems Analysis is described. As an implementation framework, the Supply & Distribution Department in the Turkish Branch of an international company is used. An analysis ... -
Application of AHP to multicriteria inventory classification
(Bilkent University, 1993)In this thesis, a new method based on the application of Analytic Hierarchy Process (AHP) to ABC inventory classification is investigated. The traditional ABC classification method utilizes only the unit price and the ... -
An application of Silver Meal Heuristic to MRP lot sizing decisions at Turk Traktor Fabrikasi
(Bilkent University, 1995)MRP does not consider setup and inventory holding costs for lot sizing but very quick algorithms like Silver-Meal can be used for lot sizing decisions. A module to apply Silver-Meal Heuristic to manufacturing work order ... -
Application of the critical path method to the planning of a technology transfer project using linear programming
(Bilkent University, 1993)The main purpose of this thesis is to utilize the critical path method in the planning of a technology transfer project by using linear programming. LINDO software is practiced in establishing the linear programming ... -
Assembly line balancing problem: Comparison of some heuristic procedures
(Bilkent University, 1989)Assembly line balancing problem can be defined as assigning tasks to an ordered sequence of stations, such that the precedence relations among the tasks are satisfied and some pel- hormarice measure (e.g. toLal idle ... -
A case study in marketing manufacturing interface: steel pipes and tubes factory
(Bilkent University, 1997)Interfunctional harmony (cooperation, coordination and communication) between marketing and manufacturing in a steel pipes and tubes factory is analysed by a qualitative research tool in this thesis. Interfunctional ... -
A case study in marketing-manufacturing interface
(Bilkent University, 1995)The coordination between the marketing and manufacturing departments plays an important role in the implementation of the corporate strategy. The conflicts and gaps between these two departments impede the successful ... -
Cost analysis of Bilkent University housing complex from a cost accounting application framework
(Bilkent University, 1993)The cost centers of the housing facility of Bilkent University are examined to determine the total expenditure figure for 1992. Data are separated for East and Center Campus housing areas and compared in terms of different ... -
Critical path analysis in project management: An Application
(Bilkent University, 1989)Critical Path Analysis (CPA) in project management has found extensive applications in the last three decades, mainly because it enables the completion of project in the shortest possible time and increases the efficiency. ... -
Efficiency of CONWIP production lines: a simulation study
(Bilkent University, 1994)Today in industiy production lines are stochastic systems. These systems are designed to optimize some performanee measures; the perfoimance measures are generally the throughput and WIP of the systems. Managers want to ... -
Evaluation of a consumer durable investment project: a feasibility study
(Bilkent University, 1996)Investment projects have to be analyzed veiy carefully before they have been realized. Feasibility study is the most important part of this analysis process. The aim of this study is to propose a systematic project ... -
Evaluation of the Turkish army soldier recruitment system and a model proposal for the optimization of soldier recruitment system
(Bilkent University, 2005)This study evaluates the Turkish Army recruitment system by measuring the total deviations of personnel inventories from the target value of inventory level. The target inventory level is the average of projected available ... -
Heuristic solution models for the single item, uncapacitated lot-sizing problems
(Bilkent University, 1990)Single item, deterministic, periodic review, uncapacitated production/inventory models are especially important because of their applications in material requirements planning (MRP) systems. In this thesis, the relevant ... -
The impact of reengineering in manufacturing companies: a methodology for operations improvement and manufacturing productivity
(Bilkent University, 1993)Many manufacturing companies today are facing the problem of loosing their competitive edge in international markets. This is partly due to the outdated manufacturing processes. This study is examining the improvement ... -
An information system based on system analysis approach for course scheduling in universities
(Bilkent University, 1996)The basic aim of this study is to provide additional insights on the subject of course scheduling in universities. Course scheduling is a very time consiuning effort, and involves different parties like students, instructors ... -
Inventory control system: a case study
(Bilkent University, 1992)There are two objectives of inventory control system. The first one is to maximize the level of the costumer service by having the right goods in sufficient quantities, in the right place, and at the right time. The ... -
An inventory management system for Özaltın Construction and Trading Company
(Bilkent University, 1992)This study basically deals with establishing an inventory management system for Ozaltin Construction and Trading Company. It is aimed at improving the inventory control system through better allocation of operating ... -
An inventory management system for the Purchasing Department of Bilkent University
(Bilkent University, 1991)ABC Classification enables management to establish an effective inventory management system. The Economic Order Quantity (EOQ) model minimizes the costs associated with ordering items and holding stocks. This study ...