Esmer, Berkhan N.2016-01-082016-01-081995http://hdl.handle.net/11693/17697Ankara : The Department of Management and Graduate School of Business Administration of Bilkent Univ., 1995.Thesis (Master's) -- Bilkent University, 1995.Includes bibliographical references leaves 52.MRP does not consider setup and inventory holding costs for lot sizing but very quick algorithms like Silver-Meal can be used for lot sizing decisions. A module to apply Silver-Meal Heuristic to manufacturing work order releases at Türk Traktör Fabrikasy, Ankara, Turkey is designed and tested for 3 months. The module processes demand for finished goods, determines lot sizes, checks capacities by loading machines according to the schedule and reports the setup, inventory holding and overtime costs. These cost figures are compared with the MRP lot sizes. It is observed that, the planning time decreased by 90% by designing module in PCs connected to the main databases, and the total costs decreased by 50%.52 leaves, tablesEnglishinfo:eu-repo/semantics/openAccessMRP Lot-sizingCapacity planningSilver-MealTürk Traktör FabrikasiHD40 .E86 1995Inventories--Management.Inventory control--Mathematical models.Industrial capacity--Mathematical models.Production planning.Production scheduling.Economic lot size.Manufacturing resource planning.Cost control.Automobile industry and trade--Turkey.An application of Silver Meal Heuristic to MRP lot sizing decisions at Turk Traktor FabrikasiThesisBILKUTUPB053808