Mete, Hasan Ali2016-01-082016-01-081989http://hdl.handle.net/11693/17214Ankara : The Department of Management and the Graduate School of Business Administration of Bilkent Univ. , 1989.Thesis (Master's) -- Bilkent University, 1989.Includes bibliographical references leaves 56-58.Assembly line balancing problem can be defined as assigning tasks to an ordered sequence of stations, such that the precedence relations among the tasks are satisfied and some pel- hormarice measure (e.g. toLal idle tune; is opLimized- in this work, some heuristic methods are examined and compared for an 11-element assembly line balancing problem for fixed F-ratios and cycle times. The results of the experiments show that there is no significant difference between the four selected heuristic procedures.xi, 58 leaves, illustrationsEnglishinfo:eu-repo/semantics/openAccessAssembly Line Balancing ProblemHeuristic ProcedureWork ElementBalance Delay RatioHD30.29 .M565 1989Assembly-line balancing.Mass production.Assembly-line methods.Work design.Assembly line balancing problem: Comparison of some heuristic proceduresThesisBILKUTUPB004676