Show simple item record

dc.contributor.advisorErel, Erdal
dc.contributor.authorBodur, İbrahim Volkan
dc.date.accessioned2016-01-08T20:08:46Z
dc.date.available2016-01-08T20:08:46Z
dc.date.issued1990
dc.identifier.urihttp://hdl.handle.net/11693/17273
dc.descriptionAnkara : The Department of Management and the Graduate School of Business Administration of Bilkent Univ., 1990.en_US
dc.descriptionThesis (Master's) -- Bilkent University, 1990.en_US
dc.descriptionIncludes bibliographical references leaves 35-36.en_US
dc.description.abstractCritical Path Method (CPM) is an economic and useful tool to aid managers during preparation and application of projects for scheduling, giving control and coordination, and solving the problems. In this study, CPM is applied to İzmir Winery Wastewater Treatment Plant. A schedule is calculated by CPM and its network diagram and bar chart of ,works is prepared with the Primavera Project Planner which-is a project management and control software.en_US
dc.description.statementofresponsibilityBodur, İbrahim Volkanen_US
dc.format.extentvi, 80 leavesen_US
dc.language.isoEnglishen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectcritical path methoden_US
dc.subjectplanning and schedulingen_US
dc.subjectwastewater treatment planten_US
dc.subject.lccTS158 .B63 1990en_US
dc.subject.lcshCritical path analysis.en_US
dc.subject.lcshSewage disposal plants.en_US
dc.titleUtilization of critical path method in the planning of İzmir Winery Wastewater Treatment Planten_US
dc.typeThesisen_US
dc.departmentDepartment of Managementen_US
dc.publisherBilkent Universityen_US
dc.description.degreeM.S.en_US