Search
Now showing items 1-9 of 9
Modelling and optimisation of Turkish Army 5th level renovation maintenance system via simulation
(Bilkent University, 2000)
Logistics is the application of time and space factors to war. It is the economics of
warfare, and it comprises, in the broadest sense, the three big M's of warfare;
material, movement, and maintenance. This thesis ...
A timetabling problem: constraint and mathematical programming approaches
(Bilkent University, 2000)
Simulation of casualty evacuation of brigade in defence operation
(Bilkent University, 2000)
‘The medical history of war casts light not only upon the suffering of those
who fight but upon the dedication of those who save. Though the association
between slaying and saving is paradoxical, it exists and helps to ...
Evaluation of Army Corps artillery ammunition supply system via simulation
(Bilkent University, 2000)
Since the use of enhanced technology by the opposing forces, Turkish Armed Forces
must adopt new tactics, employ appropriately upgraded delivery equipment to deliver
rations, fuel, ammunition, personnel, repair parts to ...
An inventory model for randomly perishing goods
(Bilkent University, 2000)
In this study, we consider an (s, S) ordering policy with backordering for a
continuous review inventory system, where the items have a random shelflife.
Assuming zero lead time and no decay until the shelflife, we derive ...
Modified block replacement models in discrete and continuous time
(Bilkent University, 2000)
In this study, we present modified multi-component block replacement
policies. Units (items) are replaced only at prescribed times j = 1,2,... A
failed unit is changed with a good one with probability a. Replacement ...
Asymptotic analysis of highly reliable retrial queueing systems
(Bilkent University, 2000)
The thesis is concerned with the asymptotic analysis of the time of first loss
of a customer and the flow of lost customers in some types of Markov retrial
queueing systems with flnite buffer. A retrial queueing system ...
A multiperiod capital budgeting problem: the ten-year acquisition program of the Turkish Armed Forces
(Bilkent University, 2000)
Structuring the Ten-year Acquisition Program of the Turkish Armed Forces is a
critical problem faced during the defense planning process. This is essentially a
resource allocation process. Since the decisions have long-term ...
A goal-programming model for Turkish Army promotion and manpower planning system
(Bilkent University, 2000)
In the Turkish Army, officers are promoted to a higher rank automatically after they
complete the period specified for their ranks. Currently, the number of officers on
duty is sufficient to fill approximately 70 % of ...