Search
Now showing items 1-10 of 10
Optimal hybrid control of a two-stage manufacturing system
(IEEE, 2006)
We consider a two-stage serial hybrid system for which the arrival times are known and the service times are controllable. We derive some optimal sample path characteristics, in particular, we show that no buffering is ...
Scheduling in a three-machine flexible robotic cell
(IFAC, 2006)
In this study, a three-machine flexible robotic manufacturing cell in which the CNC machines are used is considered. These machines are highly flexible and are capable of performing several different operations. Each machine ...
Pure cycles in flexible robotic cells
(Elsevier, 2009)
In this study, an m-machine flexible robotic manufacturing cell consisting of CNC machines is considered. The flexibility of the machines leads to a new class of robot move cycles called the pure cycles. We first model the ...
Dynamic lot sizing and tool management in automated manufacturing systems
(Elsevier, 2002)
The overall aim of this study is to show that there is a critical interface between the lot sizing and tool
management decisions, and these two problems cannot be viewed in isolation. We propose "ve alternative
algorithms ...
A problem space genetic algorithm in multiobjective optimization
(Springer New York LLC, 2003)
In this study, a problem space genetic algorithm (PSGA) is used to solve bicriteria tool management and scheduling problems simultaneously in flexible manufacturing systems. The PSGA is used to generate approximately ...
An evaluative study of operation grouping policies in an FMS
(Kluwer Academic Publishers, 2003)
The increased use of flexible manufacturing systems to provide customers with diversified products efficiently has created a significant set of operational challenges for managers. This technology poses a number of decision ...
Reactive scheduling in a dynamic and stochastic FMS environment
(Taylor & Francis, 2003)
In this paper, we study the reactive scheduling problems in a dynamic and stochastic manufacturing environment. Specifically, we develop a simulationbased scheduling system for flexible manufacturing systems. We also propose ...
Non-identical parallel CNC machine scheduling
(Taylor & Francis, 2003)
In this study, we solve the non-identical parallel CNC machine scheduling problem. We have two objectives: minimizing the manufacturing cost (comprising machining, non-machining and tooling costs) and minimizing the total ...
Integrated scheduling and tool management in flexible manufacturing systems
(Taylor & Francis, 2001)
A multistage algorithm is proposed that will solve the scheduling problem in a flexible manufacturing system by considering the interrelated subproblems of processing time control, tool allocation and machining conditions ...
Due date and cost-based FMS loading, scheduling and tool management
(Taylor & Francis, 2007)
In this study, we consider flexible manufacturing system loading, scheduling and tool management problems simultaneously. Our aim is to determine relevant tool management decisions, which are machining conditions selection ...