• About
  • Policies
  • What is open access
  • Library
  • Contact
Advanced search
      Search 
      •   BUIR Home
      • Scholarly Publications
      • Faculty of Engineering
      • Department of Industrial Engineering
      • Search
      •   BUIR Home
      • Scholarly Publications
      • Faculty of Engineering
      • Department of Industrial Engineering
      • Search
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Search

      Show Advanced FiltersHide Advanced Filters

      Filters

      Use filters to refine the search results.

      Now showing items 1-2 of 2

      • Sort Options:
      • Relevance
      • Title Asc
      • Title Desc
      • Issue Date Asc
      • Issue Date Desc
      • Results Per Page:
      • 5
      • 10
      • 20
      • 40
      • 60
      • 80
      • 100
      Thumbnail

      Stochastic lot sizing problem with controllable processing times 

      Koca, E.; Yaman, H.; Aktürk, M. S. (Elsevier, 2015)
      In this study, we consider the stochastic capacitated lot sizing problem with controllable processing times where processing times can be reduced in return for extra compression cost. We assume that the compression cost ...
      Thumbnail

      Lot sizing with piecewise concave production costs 

      Koca, E.; Yaman, H.; Aktürk, M. S. (Institute for Operations Research and the Management Sciences (I N F O R M S), 2014)
      We study the lot-sizing problem with piecewise concave production costs and concave holding costs. This problem is a generalization of the lot-sizing problem with quantity discounts, minimum order quantities, capacities, ...

      Browse

      All of BUIRCommunities & CollectionsTitlesAuthorsAdvisorsBy Issue DateKeywordsTypeDepartmentsCoursesThis CollectionTitlesAuthorsAdvisorsBy Issue DateKeywordsTypeDepartmentsCourses

      My Account

      Login

      Discover

      Author
      Aktürk, M. S. (2)
      Koca, E. (2)
      Yaman, H. (2)KeywordsControllable processing times (1)Dynamic programming (1)Lot sizing (1)Piece-wise (1)Piecewise concave production cost (1)Production cost (1)Quantity discounts (1)Second order cone programming (1)Stochastic lot sizing (1)Subcontracting (1)... View MoreDate Issued2014 (1)2015 (1)TypeArticle (2)Has File(s)Yes (2)

      Bilkent University

      If you have trouble accessing this page and need to request an alternate format, contact the site administrator. Phone: (312) 290 2976
      © Bilkent University - Library IT

      Contact Us | Send Feedback | Off-Campus Access | Admin | Privacy