Search
Now showing items 1-1 of 1
Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance
(John Wiley & Sons, Inc., 2003)
The machine scheduling literature does not consider the issue of tool change. The
parallel literature on tool management addresses this issue but assumes that the change is due
only to part mix. In practice, however, a ...