Now showing items 1-2 of 2

    • Batch scheduling to minimize the weighted number of tardy jobs 

      Erel, E.; Ghosh, J. B. (Pergamon Press, 2007)
      In this paper, we address a single-machine scheduling problem with due dates and batch setup times to minimize the weighted number of tardy jobs. We give a pseudo-polynomial dynamic program and a fully-polynomial approximation ...
    • Shortest-route formulation of mixed-model assembly line balancing problem 

      Erel, E.; Gokcen, H. (Elsevier, 1999)
      A shortest-route formulation of the mixed-model assembly line balancing problem is presented. Common tasks across models are assumed to exist and these tasks are performed in the same stations. The formulation is based on ...